Mobile dust collection cart


Working in a small shop with little to no wall space can be a challenge. This project solves that challenge by mounting a Dust Right Wall-Mount Dust Collector 1250cfm on a stand with casters.

Char Miller-King standing next to dust collector

This is typically used as a stationary dust collector, but this cart makes it mobile. This cart can be built with one sheet of plywood and a few 2x4’s in just a few hours!

Project design and plan by Char Miller-King from The Wooden Maven.

Download the Dust Collector Cart Plan

dust collector cart project plan download button

dust collector mounted on a tall vertical cart

This dust collector cart features the Dust Right Wall-Mount Dust Collector 1250cfm (left) and the Overarm Dust Hood (right).


This project was designed and built by Char Miller-King from The Wooden Maven. You can find more of Char's work at:
www.thewoodenmaven.com.